Skip to content
Published on Oct 26, 2026

Price the Next Job From a Margin That Has Settled

Ken Ndegwa, CPA, founder of Fieldcrest Accounting

Ken Ndegwa

A contractor stands at a wood desk in a small office, closed folder and blank pad on the desk, pickup visible through the window.

The number is supposed to go out before the end of the day. Someone pulls up the job the crew just left, the one people still call the good one, and starts copying hours. The building type matches. The crew size matches. The margin looked fine.

That is how an owner-led contractor in Dallas–Fort Worth can bid the next job on a story the books have not finished. A past job is a fair pricing reference only after its margin has settled: costs still expected are in, pending change orders sit outside the approved contract, and the hours and prices are ones you would bid again.

The job everyone wants to copy

A full schedule makes the shortcut feel practical. The similar job is the fastest number in the building. Labor, materials, and subcontractor bills did not arrive as one package. They came in pieces, and some of them may still be coming.

Fieldcrest's construction page describes that same split. Job costs have to be coded consistently before one project can be compared with another. Pending change orders have to stay visible, and separate from approved scope, when you judge how a job did. Job gross margin on that page is the revenue left after the costs classified as direct job costs. Costs still expected have to be reviewed before an unfinished job's margin is treated as settled.

What usually gets copied is the memory, not the file. The room remembers that the job made money. The file may still hold a cost to complete nobody has walked, a bill that has not been coded, or an extra the customer has not approved. Any one of those can make the "good" job a poor template.

The decisions that inherit a soft number

Once the bid goes out, later choices inherit it.

You staff the new job to hours the last crew did not work, or to hours they worked and nobody put on that job. You buy material from a price the supplier has already moved. You walk into Monday's meeting and describe the backlog as priced like work you know, while the reference job was still open.

The cash question arrives before the margin does. Winning the work means funding payroll and materials on a timing the first application may not match. Fieldcrest's construction page puts that plainly: winning the next job should not mean guessing whether you can fund it. A reference job that still has money withheld, or an extra nobody has priced, cannot answer that. Looking profitable and being fundable are different facts.

See how Fieldcrest supports construction accounting and job visibility

Four checks before the number goes out

Run the reference job through four checks. A failed check does not make the job useless. It means the job cannot be the price you send.

The margin has to be settled

Use a job whose remaining cost is known, or put that remaining cost on the table and refuse to treat today's margin as the bid. An unfinished margin is a progress report. A bid is the price you are willing to live with on work you have not started.

Approved scope only

Keep pending change orders out of the revenue and out of the margin you copy. The next customer has not agreed to the last job's extra. If the result people remember depended on an extra that is still unsigned, the price describes a contract you do not have.

Hours and prices you would bid again

Take labor from hours worked on that scope. Not from the hours in the original estimate, and not from a rounded memory of how the job felt. Date the material prices. A price that was true when the last job was bought is a price for the next job only when a current quote still matches it.

Strip what will not happen again

Rework you already paid for, a crew week that belonged on another job, a deposit that landed in a different month: each one can make the reference look easier or harder than the work in front of you. Write those items in a sentence beside the margin. If nobody can name them, the job is not ready to be copied.

The figures below are an illustration so the arithmetic can be checked. They are not a Fieldcrest client, a typical Dallas–Fort Worth job, or a margin to aim at.

What you are looking atAmount
Approved contract value on the closed reference job$200,000
Direct job costs coded to that job$168,000
Job gross margin on that basis$32,000
Pending change order, kept out of the base$18,000
Current material quote versus what the reference job paid$9,500 higher

Fold the pending change order into the contract and the page shows $50,000 of margin on $218,000. That is a larger contract than the one that was approved. Leave the $18,000 out, and the reference stays $32,000 on $200,000. If labor, subcontractors, and the rest of the direct cost were unchanged, copying the old material price would put the new job $9,500 behind that reference before the crew starts. The bid carries the $9,500, or it is a different job with a familiar name.

Get the Contractor's Cash & Decision Toolkit. The five-point job financial review is the page to complete before a past job sets the next price. Get the toolkit

A profit on the last job is not a unit price

A positive job gross margin can feel like proof that the last bid was right, and therefore reusable. Sometimes the margin showed up because a late, approved extra covered a miss in labor. Sometimes it showed up because a direct cost was coded to overhead, or to the job next door. Either result can be real for that job and false as a template.

Generally applicable practice: compare jobs on the same cost categories, keep unapproved scope out of approved contract value, and review costs still expected before a margin is treated as settled.

Operating rule for the bid: if the person pricing the work cannot point to the reference job, the cutoff date, and the items kept out, the number is a memory. Write those three down before it goes out. That rule does not interpret the contract, decide a tax method, or predict what the job will earn.

General education only. This article does not provide individualized accounting, tax, legal, lending, or contract advice.

When the file is not ready to be a price

One clean job can pass the four checks in an afternoon, if the coding is consistent and someone will stand behind what is left to spend. The checks stall when several jobs are open, bills are still in the field, and the margin people quote is the one from the meeting.

That is a visibility problem, not a reason to stop bidding. A dependable close, consistent job-cost categories, and a cash view that separates money you can use from money you hope to bill will not choose the number for you. They will keep the last job's unfinished story from becoming the next job's price.

Ready for clearer financial direction? Book a Financial Direction Review with direct principal access. Book your review