Job-costing tool
Texas Construction Labor Burden Calculator
See what one productive labor hour actually costs for a single employee or homogeneous labor class, then optionally price a job against that rate.
Entries stay in this browser tab only. Refresh, close, or reset clears them. Copy tool link shares the page URL, never your numbers.
Educational estimate for planning. Not payroll advice, not a tax computation, not an insurance quote, and not a legally required overtime determination. Fieldcrest is not a public accounting firm.
What you’ll need
- Base hourly wage for one employee or one labor class
- Annual regular paid hours and, if any, overtime hours and pay multiplier
- Annual productive job hours (the denominator for the hourly rate)
- Annual employer payroll-tax, workers’ compensation, benefit, and other direct labor amounts from your records—or mark a category not included
- Annual overhead allocated to this class only, not the whole company
- Optional: job hours, other direct costs, quoted revenue, and a target margin
How to read the result
The fully burdened labor rate is annual wages plus included employer burden, divided by productive hours. Allocated overhead is shown as its own hourly figure and in a combined overhead-inclusive rate. Do not treat those as one number.
Formulas
Annual wages
W = wage × regular paid hours + wage × overtime multiplier × overtime hours. When overtime hours are zero, the second term is omitted.
Employer burden and labor cost
Direct burden E is the sum of included employer payroll taxes, workers’ compensation, benefits, and other direct labor costs. Annual labor cost L = W + E. Categories marked not included are treated as zero and listed as exclusions.
Hourly rates
Fully burdened labor rate = L ÷ productive hours. Overhead per productive hour = allocated overhead ÷ productive hours. Overhead-inclusive hourly cost = (L + overhead) ÷ productive hours. Employer burden as a percent of wages = 100 × E ÷ W, and is unavailable when wages are zero.
Project worksheet
Labor cost = project hours × (L ÷ productive hours). Allocated overhead = project hours × (overhead ÷ productive hours). Total estimated cost C = project hours × ((L + overhead) ÷ productive hours) + other direct project costs. Profit P = revenue − C. Margin = 100 × P ÷ revenue (unavailable when revenue is zero). Return on estimated cost = 100 × P ÷ C (unavailable when C is zero). That return equals markup on cost; it is not annualized investment return, cash-flow return, or return on capital employed. Required price for target margin g is C ÷ (1 − g), with g as a fraction, 0 ≤ g < 1.
When the rate is in hand, start a Financial Direction Review to tie it to close discipline and job costing.
Calculation version labor-burden-v1.
Worked example
Illustrative only: wage $30; regular paid hours 2,080; overtime 0; productive hours 1,600; employer costs $18,720; allocated overhead $16,000. Project: 400 hours, $20,000 other costs, $60,000 revenue, 30% target margin.
Wages $62,400; annual labor cost $81,120; fully burdened rate $50.70/hr; overhead $10.00/hr; overhead-inclusive rate $60.70/hr; employer burden 30.00% of wages. Project labor $20,280; overhead $4,000; total cost $44,280; profit $15,720; margin 26.20%; return on estimated cost 35.50%; price for 30% margin $63,257.14.
Assumptions
- All wage, hour, and cost inputs refer to the same employee or homogeneous labor class and the same annual estimation period.
- Money is USD. Hours are hours per year unless labeled as project hours.
- Paid leave already counted in regular paid hours is not added again as a wage benefit.
- The overtime multiplier is the estimator’s pay factor, not a finding that any particular worker is legally due that multiplier.
- Overhead must be the amount allocated to this class only. Do not also place the same payroll administration, vehicle, insurance, or owner-compensation dollars in another category.
- Project costs cover this labor class. Other classes belong in other direct project costs, using separately calculated amounts.
- Pass-through sales or use tax treatment follows the estimator’s consistent revenue and cost basis. This tool does not invent tax rules.
What this tool does not do
- No automatic IRS, Texas unemployment, or insurance rate tables
- No prevailing-wage, worker-classification, or overtime-eligibility engine
- No cash-flow, WIP, retainage, or crew-aggregation model
- No accounts, saved scenarios, email of results, or lead gate
Texas input guidance
Employer payroll taxes
Enter the annual employer share from payroll records or a qualified estimate. Do not enter employee withholding. This calculator does not apply federal or Texas percentages for you—wage bases, credits, and unemployment factors are employer-specific.
Texas unemployment tax
Texas Workforce Commission administers employer unemployment tax. Those amounts are employer costs, not employee withholding. Look up your TWC account materials; do not treat a neighbor’s rate as yours.
Workers’ compensation
Texas private employers generally may choose whether to carry workers’ compensation coverage, with important exceptions (including certain government construction contracts). Enter the annual cost allocated to this class if you carry coverage, or mark the category not included.
Overtime pay
U.S. Department of Labor Fact Sheet #23 summarizes FLSA overtime for covered, nonexempt employees. This tool does not decide coverage, exemptions, or the legally correct regular rate. Supply the multiplier you actually pay or intend to cost.
FAQ
Paid hours are hours you pay, including paid leave and paid nonproductive time. Productive hours are hours that land on jobs in your costing policy. Travel, training, and idle time often stay in paid hours and drop out of productive hours. The hourly burden uses productive hours as the denominator, so fewer productive hours raise the rate.
Sources
- IRS Publication 15 (Circular E), Employer’s Tax Guide (for use in 2026) — accessed 2026-09-18. Describes employer responsibilities for federal employment taxes. Used only to point estimators to primary employer-tax guidance—not to ship a rate table.
- Texas Workforce Commission — Unemployment Tax Program — accessed 2026-09-18. TWC administers Texas employer unemployment tax. Unemployment tax basics state that unemployment taxes are not deducted from employee wages.
- Texas Workforce Commission — Unemployment Tax Basics — accessed 2026-09-18. Confirms employer-paid character of Texas unemployment tax and directs employers to TWC reporting rules rather than a site-wide default rate.
- Texas Department of Insurance — Workers’ compensation coverage verification — accessed 2026-09-18. States that Texas private employers can choose to carry workers’ compensation coverage in most cases, while governmental entities must have coverage.
- U.S. Department of Labor — Fact Sheet #23: Overtime Pay Requirements of the FLSA — accessed 2026-09-18. Summarizes that covered, nonexempt employees must receive overtime of at least one and one-half times the regular rate for hours over 40 in a workweek. Not used as a universal multiplier inside the engine.
Suggested citation: Fieldcrest Accounting, Texas Construction Labor Burden Calculator, labor-burden-v1. /blog/texas-construction-labor-burden-calculator. Methodology anchor #methodology.
Related: Construction accounting, Insights, month-end close checklist, how to build a labor rate you can explain.